The techno-economic analysis of small hydropower plants installed parameters for three different mountain watercourses

Vilotijević, Vidosava; Karadžić, Uroš; Kovijanić, Vuko; Božić, Ivan; Vujadinović, Radoje

(Društvo termičara Srbije, 2021)

TY  - CONF
AU  - Vilotijević, Vidosava
AU  - Karadžić, Uroš
AU  - Kovijanić, Vuko
AU  - Božić, Ivan
AU  - Vujadinović, Radoje
PY  - 2021
UR  - http://e2021.drustvo-termicara.com/book
UR  - https://machinery.mas.bg.ac.rs/handle/123456789/6507
AB  - In the last decade, hydrological data measurements, acquisitions and analyses of various Montenegrin mountain watercourses were carried out comprehensively. The data were analyzed respecting the hitherto known approaches in determining the small hydropower plant (SHPP) installed parameters. The SHPP installed parameter Ki is the ratio of the design flow and averaged perennial flow obtained from the flow duration curve at the planned water intake location. Due to the specifics of the rivers, it was not possible to define the installed parameters easily and clearly. For this reason, an improved multidisciplinary approach was conducted, which would lead to clearer general guidelines for quality and efficient determination of the SHPPs installed parameter respecting environmental requirements for each of them. The range of SHPP installed parameters is determined according to the technical and economic criteria. In this paper, the conclusions for three different SHPPs are presented comparing the calculated results and in-situ ones.
PB  - Društvo termičara Srbije
C3  - Full Papers Proceeding of International Conference „Power Plants 2021“, 17-18. November 2021
T1  - The techno-economic analysis of small hydropower plants installed parameters for three different mountain watercourses
IS  - E2021-040
UR  - https://hdl.handle.net/21.15107/rcub_machinery_6507
ER  - 
@conference{
author = "Vilotijević, Vidosava and Karadžić, Uroš and Kovijanić, Vuko and Božić, Ivan and Vujadinović, Radoje",
year = "2021",
abstract = "In the last decade, hydrological data measurements, acquisitions and analyses of various Montenegrin mountain watercourses were carried out comprehensively. The data were analyzed respecting the hitherto known approaches in determining the small hydropower plant (SHPP) installed parameters. The SHPP installed parameter Ki is the ratio of the design flow and averaged perennial flow obtained from the flow duration curve at the planned water intake location. Due to the specifics of the rivers, it was not possible to define the installed parameters easily and clearly. For this reason, an improved multidisciplinary approach was conducted, which would lead to clearer general guidelines for quality and efficient determination of the SHPPs installed parameter respecting environmental requirements for each of them. The range of SHPP installed parameters is determined according to the technical and economic criteria. In this paper, the conclusions for three different SHPPs are presented comparing the calculated results and in-situ ones.",
publisher = "Društvo termičara Srbije",
journal = "Full Papers Proceeding of International Conference „Power Plants 2021“, 17-18. November 2021",
title = "The techno-economic analysis of small hydropower plants installed parameters for three different mountain watercourses",
number = "E2021-040",
url = "https://hdl.handle.net/21.15107/rcub_machinery_6507"
}
Vilotijević, V., Karadžić, U., Kovijanić, V., Božić, I.,& Vujadinović, R.. (2021). The techno-economic analysis of small hydropower plants installed parameters for three different mountain watercourses. in Full Papers Proceeding of International Conference „Power Plants 2021“, 17-18. November 2021
Društvo termičara Srbije.(E2021-040).
https://hdl.handle.net/21.15107/rcub_machinery_6507
Vilotijević V, Karadžić U, Kovijanić V, Božić I, Vujadinović R. The techno-economic analysis of small hydropower plants installed parameters for three different mountain watercourses. in Full Papers Proceeding of International Conference „Power Plants 2021“, 17-18. November 2021. 2021;(E2021-040).
https://hdl.handle.net/21.15107/rcub_machinery_6507 .
Vilotijević, Vidosava, Karadžić, Uroš, Kovijanić, Vuko, Božić, Ivan, Vujadinović, Radoje, "The techno-economic analysis of small hydropower plants installed parameters for three different mountain watercourses" in Full Papers Proceeding of International Conference „Power Plants 2021“, 17-18. November 2021, no. E2021-040 (2021),
https://hdl.handle.net/21.15107/rcub_machinery_6507 .

An Improved Techno-Economic Approach to Determination of More Precise Installed Parameter for Small Hydropower Plants

Vilotijević, Vidosava; Karadzić, Uroš; Vujadinović, Radoje; Kovijanić, Vuko; Božić, Ivan

(MDPI, Basel, 2021)

TY  - JOUR
AU  - Vilotijević, Vidosava
AU  - Karadzić, Uroš
AU  - Vujadinović, Radoje
AU  - Kovijanić, Vuko
AU  - Božić, Ivan
PY  - 2021
UR  - https://machinery.mas.bg.ac.rs/handle/123456789/3528
AB  - Designing a small hydropower plant (SHPP) necessitates fulfillment of energy and ecological constraints, so a well-defined design flow is of the utmost significance. The main parameters of each SHPP are determined by appropriate techno-economic studies, whereas an improved approach to defining more precise SHPP installed parameter is presented in this paper. The SHPP installed parameter is the ratio of the design flow and averaged perennial flow obtained from the flow duration curve at the planned water intake location. Previous experiences in the design of SHPPs have shown that the SHPP installed parameter has a value in a wide range without the existence of an unambiguous equation for its determination. Therefore, with this aim, the thirty-eight (38) small watercources in the territory of Montenegro, denominated for the construction of SHPPs, have been investigated. SHPPs are divided into two groups depending on the installed capacity and the method of calculating the purchase price of electricity. For both groups, the range of SHPP installed parameter is determined according to the technical and economic criteria: the highest electricity production, the highest income, net present value (NPV), internal rate of return (IRR), and payback period (PB).
PB  - MDPI, Basel
T2  - Water
T1  - An Improved Techno-Economic Approach to Determination of More Precise Installed Parameter for Small Hydropower Plants
IS  - 17
VL  - 13
DO  - 10.3390/w13172419
ER  - 
@article{
author = "Vilotijević, Vidosava and Karadzić, Uroš and Vujadinović, Radoje and Kovijanić, Vuko and Božić, Ivan",
year = "2021",
abstract = "Designing a small hydropower plant (SHPP) necessitates fulfillment of energy and ecological constraints, so a well-defined design flow is of the utmost significance. The main parameters of each SHPP are determined by appropriate techno-economic studies, whereas an improved approach to defining more precise SHPP installed parameter is presented in this paper. The SHPP installed parameter is the ratio of the design flow and averaged perennial flow obtained from the flow duration curve at the planned water intake location. Previous experiences in the design of SHPPs have shown that the SHPP installed parameter has a value in a wide range without the existence of an unambiguous equation for its determination. Therefore, with this aim, the thirty-eight (38) small watercources in the territory of Montenegro, denominated for the construction of SHPPs, have been investigated. SHPPs are divided into two groups depending on the installed capacity and the method of calculating the purchase price of electricity. For both groups, the range of SHPP installed parameter is determined according to the technical and economic criteria: the highest electricity production, the highest income, net present value (NPV), internal rate of return (IRR), and payback period (PB).",
publisher = "MDPI, Basel",
journal = "Water",
title = "An Improved Techno-Economic Approach to Determination of More Precise Installed Parameter for Small Hydropower Plants",
number = "17",
volume = "13",
doi = "10.3390/w13172419"
}
Vilotijević, V., Karadzić, U., Vujadinović, R., Kovijanić, V.,& Božić, I.. (2021). An Improved Techno-Economic Approach to Determination of More Precise Installed Parameter for Small Hydropower Plants. in Water
MDPI, Basel., 13(17).
https://doi.org/10.3390/w13172419
Vilotijević V, Karadzić U, Vujadinović R, Kovijanić V, Božić I. An Improved Techno-Economic Approach to Determination of More Precise Installed Parameter for Small Hydropower Plants. in Water. 2021;13(17).
doi:10.3390/w13172419 .