Приказ основних података о документу

Selection of optimal technical solution for flue gas desulphurisation plant on TPP 'Kostolac B'

dc.creatorStojiljković, Dragoslava
dc.creatorJovović, Aleksandar
dc.creatorJovanović, Vladimir
dc.creatorManić, Nebojša
dc.creatorMilovanović, Đorđina
dc.creatorPetrović, Sanja
dc.creatorRubov, Lin
dc.creatorGavrić, Mihajlo
dc.creatorŽbogar, Zrinka
dc.date.accessioned2022-09-19T16:17:32Z
dc.date.available2022-09-19T16:17:32Z
dc.date.issued2009
dc.identifier.issn0350-218X
dc.identifier.urihttps://machinery.mas.bg.ac.rs/handle/123456789/913
dc.description.abstractU skladu sa svojim opredeljenjem da rad svojih termoenergetskih objekata uskladi sa zahtevima regulative Evropske Unije koja se odnosi na zaštitu životne sredine, Elektroprivreda Srbije je započela proces projektovanja postrojenja za smanjenje emisija sumpornih oksida. Prema zaključcima Studije 'Pravci optimalnog smanjenja emisije sumpornih oksida iz termoelektrana Elektroprivrede Srbije', TE 'Kostolac B' je izabrana kao prva termoelektrana na kojoj je planirana izgradnja ovakvog postrojenja. U toku je izrada projektne dokumentacije za dobijanje dozvole za gradnju postrojenja za odsumporavanje dimnog gasa (ODG) i izradu tenderske dokumentacije za izbor konsultanta za realizaciju projekta do puštanja postrojenja u pogon. Na osnovu prethodno prihvaćenih analiza kao referentni postupak odsumporavanja definisan je vlažni krečnjak/gips postupak. Imajući u vidu da predviđeno postrojenje za odsumporavanje s jedne strane predstavlja poseban sistem u okviru TE, a s druge i deo elektrane kao celine, projektovanje ovog postrojenja mora uzeti u obzir sve zahteve koji se odnose na uklapanje ovog postrojenja u postojeće procese TE, kako bi se obezbedio njen nesmetani pogon u narednom periodu. U ovom radu prikazani su: (1) osnovni zahtevi koji predstavljaju ulazne parametre za projektovanje postrojenja za odsumporavanje, koji se odnose na zahtevani kvalitet sorbenta i vode, karakteristike dimnih gasova i zahtevani nivo odsumporavanja dimnih gasova; (2) osnovne karakteristike glavnih sistema postrojenja za ODG; (3) moguće opcije tehničkih rešenja postrojenja sa aspekta uklapanja u raspoloživi prostor i postojeće sisteme TE i (4) predlog optimalnog rešenja postrojenja za ODG sa aspekta funkcionalnosti i pouzdanosti rada postrojenja, investicionih ulaganja i pogonskih troškova. .sr
dc.description.abstractAccording to own orientation for domestic power plants to fulfill requirements of the EU Directives for environmental protection, the Electric Power Industry of Serbia was started process of designing flue gas desulphurization (FGD) facilities for reduction emissions of sulphur oxides. Toward conclusions of Study: 'Optimal Direction for Reduction of Sulphur Oxides Emissions from Thermal Power Plants of the Electric Power Industry of Serbia' TPP Kostolac B was chosen as the first power plant for construction of this type of facility. Development of technical documentation is in progress for obtaining construction permit for FGD plant as well as preparation of tender documentation for selection of project consultant for system startup. Due to previously accepted analysis, wet limestone/gypsum process is defined as referential process of desulphurisation. As required FGD plant is introduced as separate system in TPP, and on the other hand as part of the TPP as a whole, design must consider all demands related to coupling the FGD plant with existing processes of TPP, to provide continuous operation for the following period. In this paper are presented: (1) main requirements which introduce initial parameters for FGD plant design, related to demanded quality of sorbent and water, flue gas composition and demanded flue gas desulphurisation efficiency; (2) fundamental characteristics of main systems of FGD plant; (3) possible options for technical solutions of FGD from the point of fitting into available space and coupling with existing systems of TPP, and (4) suggestion for optimal solution of FGD from the aspect of functionality and reliability, investment, and operative costs. .en
dc.publisherUniverzitet u Beogradu - Institut za nuklearne nauke Vinča, Beograd i Društvo termičara Srbije, Beograd
dc.rightsopenAccess
dc.sourceTermotehnika
dc.subjecttermoelektranesr
dc.subjectodsumporavanjesr
dc.subjectdimni gassr
dc.subjectpower planten
dc.subjectflue gasen
dc.subjectdesulphurisationen
dc.titleIzbor optimalnog tehničkog rešenja postrojenja za odsumporavanje dimnih gasova na TE 'Kostolac B'sr
dc.titleSelection of optimal technical solution for flue gas desulphurisation plant on TPP 'Kostolac B'en
dc.typearticle
dc.rights.licenseARR
dc.citation.epage249
dc.citation.issue3-4
dc.citation.other35(3-4): 231-249
dc.citation.rankM51
dc.citation.spage231
dc.citation.volume35
dc.identifier.fulltexthttp://machinery.mas.bg.ac.rs/bitstream/id/2753/910.pdf
dc.identifier.rcubhttps://hdl.handle.net/21.15107/rcub_machinery_913
dc.type.versionpublishedVersion


Документи

Thumbnail

Овај документ се појављује у следећим колекцијама

Приказ основних података о документу