Why the majority of countries use Bridge Management Systems?
Zašto većina država koristi sistem upravljanja mostovima?
2022
Konferencijski prilog (Objavljena verzija)
,
Folić Radomir, Folić Boris, Čokić Miloš
Metapodaci
Prikaz svih podataka o dokumentuApstrakt
The Bridge Management System (BMS) includes a systematic approach to the organized monitoring of the condition of bridges, especially the registration of defects and damage, and the performance of all activities related to maintenance and rehabilitation during the operation of bridges. In doing so, the owner of the bridges is provided with documentation to make adequate decisions on focusing the budget on individual bridges or the network of bridges according to priority. This paper analyzes some management systems abroad with a brief historical background. Until the 80’s of the previous century there was an active work on the introduction of BMS in Serbia, however since 2010 there has been a pause in the development and implementation of BMS. This situation should be overcome as soon as possible because of the general benefits of well- established and implemented BMSs for the road network and traffic improvement.
Sistem za upravljanje mostovima (BMS) obuhvata sistematizovan pristup organizovanog praćenja stanja mostova, naročito registracija defekata i oštećenja, i obavljanja svih aktivnosti vezanih za održavanje i rehabilitacije tokom eksploatacije mostova. Pri tome se vlasniku mostova obezbeđuje dokumentacija da donosi adekvatne odluke o usmeravanju budžeta na pojedine mostove ili mrežu mostova prema prioritetu. U ovom radu su analizirani neki sistemi upravljanja u inostranstvu uz sažet prikaz istorijata. U Srbiji je i pored aktivnog rada na uvođenju BMS-a, sve do osamdesetih godina prošlog stoleća, a od 2010. godine nastao je zastoj u razvoju i primeni BMS-a. To stanje bi se moralo što pre prevazići zbog opšte koristi koju dobro postavljen i primenjen BMS donosi putnoj mreži i unapređenju saobraćaja.
Ključne reči:
Bridge management systems / concrete bridges / bridge inspection / condition assessment / guidelines / bridge rating / service life / Sistem za upravljanje mostovima / betonski mostovi / pregledi mostova / procena stanja / smernice / rejting mosta / životni vekIzvor:
Zbornik radova Dvanaestog naučno-stručnog međunarodnog savetovanja, 2022Izdavač:
- Savez građevinskih inženjera Srbije
- Association of Civil Engineers of Serbia
- SGIS
- ADING
Finansiranje / projekti:
- Ministarstvo nauke, tehnološkog razvoja i inovacija Republike Srbije, institucionalno finansiranje - 200213 (Inovacioni centar Mašinskog fakulteta u Beogradu doo) (RS-MESTD-inst-2020-200213)
Napomena:
- Zbornik radova Dvanaestog naučno-stručnog međunarodnog savetovanja Ocena stanja, održavanje i sanacija građevinskih objekata, Vrnjačka Banja, 29. jun – 1. jul 2022. Conference proceedings of the Twelfth international conference Assessment, maintenance and rehabilitation of structures / [organizatori] Savez građevinskih inženjera Srbije u saradnji sa ADING ; editor Radomir Folić. - Beograd : Savez građevinskih inženjera Srbije = Association of Civil Engineers of Serbia, 2022 - 1 USB fleš memorija : tekst. ; 3 x 1 x 1 cm
Kolekcije
Institucija/grupa
Inovacioni centarTY - CONF AU - Folić, R. AU - Folić, Boris AU - Čokić, Miloš PY - 2022 UR - https://machinery.mas.bg.ac.rs/handle/123456789/7321 AB - The Bridge Management System (BMS) includes a systematic approach to the organized monitoring of the condition of bridges, especially the registration of defects and damage, and the performance of all activities related to maintenance and rehabilitation during the operation of bridges. In doing so, the owner of the bridges is provided with documentation to make adequate decisions on focusing the budget on individual bridges or the network of bridges according to priority. This paper analyzes some management systems abroad with a brief historical background. Until the 80’s of the previous century there was an active work on the introduction of BMS in Serbia, however since 2010 there has been a pause in the development and implementation of BMS. This situation should be overcome as soon as possible because of the general benefits of well- established and implemented BMSs for the road network and traffic improvement. AB - Sistem za upravljanje mostovima (BMS) obuhvata sistematizovan pristup organizovanog praćenja stanja mostova, naročito registracija defekata i oštećenja, i obavljanja svih aktivnosti vezanih za održavanje i rehabilitacije tokom eksploatacije mostova. Pri tome se vlasniku mostova obezbeđuje dokumentacija da donosi adekvatne odluke o usmeravanju budžeta na pojedine mostove ili mrežu mostova prema prioritetu. U ovom radu su analizirani neki sistemi upravljanja u inostranstvu uz sažet prikaz istorijata. U Srbiji je i pored aktivnog rada na uvođenju BMS-a, sve do osamdesetih godina prošlog stoleća, a od 2010. godine nastao je zastoj u razvoju i primeni BMS-a. To stanje bi se moralo što pre prevazići zbog opšte koristi koju dobro postavljen i primenjen BMS donosi putnoj mreži i unapređenju saobraćaja. PB - Savez građevinskih inženjera Srbije PB - Association of Civil Engineers of Serbia PB - SGIS PB - ADING C3 - Zbornik radova Dvanaestog naučno-stručnog međunarodnog savetovanja T1 - Why the majority of countries use Bridge Management Systems? T1 - Zašto većina država koristi sistem upravljanja mostovima? UR - https://hdl.handle.net/21.15107/rcub_machinery_7321 ER -
@conference{ author = "Folić, R. and Folić, Boris and Čokić, Miloš", year = "2022", abstract = "The Bridge Management System (BMS) includes a systematic approach to the organized monitoring of the condition of bridges, especially the registration of defects and damage, and the performance of all activities related to maintenance and rehabilitation during the operation of bridges. In doing so, the owner of the bridges is provided with documentation to make adequate decisions on focusing the budget on individual bridges or the network of bridges according to priority. This paper analyzes some management systems abroad with a brief historical background. Until the 80’s of the previous century there was an active work on the introduction of BMS in Serbia, however since 2010 there has been a pause in the development and implementation of BMS. This situation should be overcome as soon as possible because of the general benefits of well- established and implemented BMSs for the road network and traffic improvement., Sistem za upravljanje mostovima (BMS) obuhvata sistematizovan pristup organizovanog praćenja stanja mostova, naročito registracija defekata i oštećenja, i obavljanja svih aktivnosti vezanih za održavanje i rehabilitacije tokom eksploatacije mostova. Pri tome se vlasniku mostova obezbeđuje dokumentacija da donosi adekvatne odluke o usmeravanju budžeta na pojedine mostove ili mrežu mostova prema prioritetu. U ovom radu su analizirani neki sistemi upravljanja u inostranstvu uz sažet prikaz istorijata. U Srbiji je i pored aktivnog rada na uvođenju BMS-a, sve do osamdesetih godina prošlog stoleća, a od 2010. godine nastao je zastoj u razvoju i primeni BMS-a. To stanje bi se moralo što pre prevazići zbog opšte koristi koju dobro postavljen i primenjen BMS donosi putnoj mreži i unapređenju saobraćaja.", publisher = "Savez građevinskih inženjera Srbije, Association of Civil Engineers of Serbia, SGIS, ADING", journal = "Zbornik radova Dvanaestog naučno-stručnog međunarodnog savetovanja", title = "Why the majority of countries use Bridge Management Systems?, Zašto većina država koristi sistem upravljanja mostovima?", url = "https://hdl.handle.net/21.15107/rcub_machinery_7321" }
Folić, R., Folić, B.,& Čokić, M.. (2022). Why the majority of countries use Bridge Management Systems?. in Zbornik radova Dvanaestog naučno-stručnog međunarodnog savetovanja Savez građevinskih inženjera Srbije.. https://hdl.handle.net/21.15107/rcub_machinery_7321
Folić R, Folić B, Čokić M. Why the majority of countries use Bridge Management Systems?. in Zbornik radova Dvanaestog naučno-stručnog međunarodnog savetovanja. 2022;. https://hdl.handle.net/21.15107/rcub_machinery_7321 .
Folić, R., Folić, Boris, Čokić, Miloš, "Why the majority of countries use Bridge Management Systems?" in Zbornik radova Dvanaestog naučno-stručnog međunarodnog savetovanja (2022), https://hdl.handle.net/21.15107/rcub_machinery_7321 .
Related items
Showing items related by title, author, creator and subject.
-
Pretovarni mostovi sa elevatorima, deo II - konstrukciono rešenje, tehnologija i proračun rekonstruisane strukture / Unloading bridges with reclaimers, Part II: Structural solution, technology and calculus of structural reengineering
Bošnjak, Srđan; Petković, Zoran D.; Gašić, Vlada; Zrnić, Nenad (Savez inženjera i tehničara Srbije, Beograd, 2007) -
Pretovarni mostovi sa elevatorima - deo I. Identifikacija opterećenja, proračun strukture i zakošavanje / Unloading bridges with reclaimers - part I: Identification of loadings, structural calculus and skewing
Bošnjak, Srđan; Petković, Zoran D.; Gašić, Vlada; Zrnić, Nenad (Savez inženjera i tehničara Srbije, Beograd, 2006) -
Optimization of the Unloading Bridge Working Cycle
Bugarić, Uglješa; Vuković, Josif; Petrović, Dušan; Jeli, Zorana; Petrović, Zoran (Strojniski Vestnik/Journal of Mechanical Engineering, 2009)