Review of failure analysis of coupling systems on freight trains
2023
Конференцијски прилог (Објављена верзија)
,
Društvo za Integritet i Vek Konstrukcija “Prof dr Stojan Sedmak” – Belgrade – Serbia
Метаподаци
Приказ свих података о документуАпстракт
This paper presents a review of screw coupling and draw gear failure analysis on freight trains in Europe
and other countries where screw coupling systems are still in use. Analyses of failures show different
characteristics and applications of root cause analyses and can group them into several categories that repeat
on considered railways. A variety of failure types indicates that more than one factor causes breaks in the
coupling system, and they didn't always equally present. Most studies of failure investigate fatigue of screw
coupling and draw gear elements because of initial crack or corrosion. Some fractured elements haven’t had
signs of fatigue so other causes must be considered in the analysis, like overload, impact, inadequate material,
or certain deficiencies in heat treatments of fractured elements. Investigations were performed via a series of
experimental tests and numerical analyses using the finite element method.
Кључне речи:
railway / Coupling system / Screw coupling / Failure / Draw gearИзвор:
2nd International Symposium on Risk Analysis and Safety of Complex Structures and Components (IRAS 2023), 2023Издавач:
- Faculty of Mechanical Engineering, University of Belgrade, Serbia
Финансирање / пројекти:
- Министарство науке, технолошког развоја и иновација Републике Србије, институционално финансирање - 200105 (Универзитет у Београду, Машински факултет) (RS-MESTD-inst-2020-200105)
Колекције
Институција/група
Mašinski fakultetTY - CONF AU - Vukšić Popović, Marija AU - Tanasković, Jovan AU - Međedović, Nebojša PY - 2023 UR - https://machinery.mas.bg.ac.rs/handle/123456789/7270 AB - This paper presents a review of screw coupling and draw gear failure analysis on freight trains in Europe and other countries where screw coupling systems are still in use. Analyses of failures show different characteristics and applications of root cause analyses and can group them into several categories that repeat on considered railways. A variety of failure types indicates that more than one factor causes breaks in the coupling system, and they didn't always equally present. Most studies of failure investigate fatigue of screw coupling and draw gear elements because of initial crack or corrosion. Some fractured elements haven’t had signs of fatigue so other causes must be considered in the analysis, like overload, impact, inadequate material, or certain deficiencies in heat treatments of fractured elements. Investigations were performed via a series of experimental tests and numerical analyses using the finite element method. PB - Faculty of Mechanical Engineering, University of Belgrade, Serbia C3 - 2nd International Symposium on Risk Analysis and Safety of Complex Structures and Components (IRAS 2023) T1 - Review of failure analysis of coupling systems on freight trains UR - https://hdl.handle.net/21.15107/rcub_machinery_7270 ER -
@conference{ author = "Vukšić Popović, Marija and Tanasković, Jovan and Međedović, Nebojša", year = "2023", abstract = "This paper presents a review of screw coupling and draw gear failure analysis on freight trains in Europe and other countries where screw coupling systems are still in use. Analyses of failures show different characteristics and applications of root cause analyses and can group them into several categories that repeat on considered railways. A variety of failure types indicates that more than one factor causes breaks in the coupling system, and they didn't always equally present. Most studies of failure investigate fatigue of screw coupling and draw gear elements because of initial crack or corrosion. Some fractured elements haven’t had signs of fatigue so other causes must be considered in the analysis, like overload, impact, inadequate material, or certain deficiencies in heat treatments of fractured elements. Investigations were performed via a series of experimental tests and numerical analyses using the finite element method.", publisher = "Faculty of Mechanical Engineering, University of Belgrade, Serbia", journal = "2nd International Symposium on Risk Analysis and Safety of Complex Structures and Components (IRAS 2023)", title = "Review of failure analysis of coupling systems on freight trains", url = "https://hdl.handle.net/21.15107/rcub_machinery_7270" }
Vukšić Popović, M., Tanasković, J.,& Međedović, N.. (2023). Review of failure analysis of coupling systems on freight trains. in 2nd International Symposium on Risk Analysis and Safety of Complex Structures and Components (IRAS 2023) Faculty of Mechanical Engineering, University of Belgrade, Serbia.. https://hdl.handle.net/21.15107/rcub_machinery_7270
Vukšić Popović M, Tanasković J, Međedović N. Review of failure analysis of coupling systems on freight trains. in 2nd International Symposium on Risk Analysis and Safety of Complex Structures and Components (IRAS 2023). 2023;. https://hdl.handle.net/21.15107/rcub_machinery_7270 .
Vukšić Popović, Marija, Tanasković, Jovan, Međedović, Nebojša, "Review of failure analysis of coupling systems on freight trains" in 2nd International Symposium on Risk Analysis and Safety of Complex Structures and Components (IRAS 2023) (2023), https://hdl.handle.net/21.15107/rcub_machinery_7270 .