Show simple item record

dc.creatorBugarić, Uglješa
dc.creatorPetrović, Dušan
dc.date.accessioned2022-09-19T16:03:03Z
dc.date.available2022-09-19T16:03:03Z
dc.date.issued2007
dc.identifier.issn1569-190X
dc.identifier.urihttps://machinery.mas.bg.ac.rs/handle/123456789/706
dc.description.abstractWork of the ports (terminals) with its optimal capacity assumes prompt accommodation of vessels with minimal waiting time in the port and with maximal use of berth facilities, i.e. bigger unloading capacity. The way, how capacity of the river terminals for bulk cargo unloading call be increased, without new capital costs by introducing the strategy ill the work of the unloading devices, is presented. Hierarchical structure of the system is connected with phases of servicing and stochastic character of the input/output values is underlined. Simulation model of the terminal work with strategy is developed. This results in shorter time needed for vessel unloading and therefore bigger unloading capacity of the terminal. Some of obtained results are applied and verified on existing system.en
dc.publisherElsevier Science Bv, Amsterdam
dc.rightsrestrictedAccess
dc.sourceSimulation Modelling Practice and Theory
dc.subjectunloadingen
dc.subjectport simulationen
dc.subjectbulk cargoen
dc.titleIncreasing the capacity of terminal for bulk cargo unloadingen
dc.typearticle
dc.rights.licenseARR
dc.citation.epage1381
dc.citation.issue10
dc.citation.other15(10): 1366-1381
dc.citation.rankM23
dc.citation.spage1366
dc.citation.volume15
dc.identifier.doi10.1016/j.simpat.2007.09.006
dc.identifier.scopus2-s2.0-36148982235
dc.identifier.wos000251721900011
dc.type.versionpublishedVersion


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record