Sustainable hydro energy use consequently on cost management
Предавање (Објављена верзија)
Метаподаци
Приказ свих података о документуАпстракт
Development of environmental awareness and ever rising need for taking environmental
conditions back to the zero stage, the way they were before the construction was built, open the question of hydropower facilities removal from the a riverbed after a given exploitation period. Compromised or endangered stability of a construction can also result in need for premature removal of the facility, before the planned exploitation period is over. The aim of this paper is to present the complexity of one hydro power plant removal project towards sustainability and holistic management of environmental quality. The total cost of structure removal is calculated and compared with the total cost of its construction. There is also a discussion on question of who should bear the expenses of the removal project and recommended answer to a decision maker from a sustainable development point of view. Simulation of removal has been done on example of gravity dam and hydropower plant Paunci on the Drina... River in Serbia.
Кључне речи:
sustainable development / cost management / removal / environmental zero stage / hydro energy useИзвор:
Sustainable Energy Use and Management, 2014, 12-Издавач:
- Academica Brancusi Publishing House, Târgu-Jiu, Romania
Финансирање / пројекти:
- Повећање енергетске ефикасности при концепцијском решавању искоришћења обновљивих ресурса у функцији одрживог развоја (RS-MESTD-MPN2006-2010-18031)
- Развој, пројектовање и имплементација савремених стратегија интегрисаног управљања оперативним радом и одржавањем возила и механизације у системима аутотранспорта, рударства и енергетике (RS-MESTD-Technological Development (TD or TR)-35030)
Колекције
Институција/група
Inovacioni centarTY - GEN AU - Stevović, Svetlana AU - Beljaković, Dejan AU - Stevović, Ivan PY - 2014 UR - https://machinery.mas.bg.ac.rs/handle/123456789/7029 AB - Development of environmental awareness and ever rising need for taking environmental conditions back to the zero stage, the way they were before the construction was built, open the question of hydropower facilities removal from the a riverbed after a given exploitation period. Compromised or endangered stability of a construction can also result in need for premature removal of the facility, before the planned exploitation period is over. The aim of this paper is to present the complexity of one hydro power plant removal project towards sustainability and holistic management of environmental quality. The total cost of structure removal is calculated and compared with the total cost of its construction. There is also a discussion on question of who should bear the expenses of the removal project and recommended answer to a decision maker from a sustainable development point of view. Simulation of removal has been done on example of gravity dam and hydropower plant Paunci on the Drina River in Serbia. PB - Academica Brancusi Publishing House, Târgu-Jiu, Romania T2 - Sustainable Energy Use and Management T1 - Sustainable hydro energy use consequently on cost management SP - 12 SP - 15 UR - https://hdl.handle.net/21.15107/rcub_machinery_7029 ER -
@misc{ author = "Stevović, Svetlana and Beljaković, Dejan and Stevović, Ivan", year = "2014", abstract = "Development of environmental awareness and ever rising need for taking environmental conditions back to the zero stage, the way they were before the construction was built, open the question of hydropower facilities removal from the a riverbed after a given exploitation period. Compromised or endangered stability of a construction can also result in need for premature removal of the facility, before the planned exploitation period is over. The aim of this paper is to present the complexity of one hydro power plant removal project towards sustainability and holistic management of environmental quality. The total cost of structure removal is calculated and compared with the total cost of its construction. There is also a discussion on question of who should bear the expenses of the removal project and recommended answer to a decision maker from a sustainable development point of view. Simulation of removal has been done on example of gravity dam and hydropower plant Paunci on the Drina River in Serbia.", publisher = "Academica Brancusi Publishing House, Târgu-Jiu, Romania", journal = "Sustainable Energy Use and Management", title = "Sustainable hydro energy use consequently on cost management", pages = "12-15", url = "https://hdl.handle.net/21.15107/rcub_machinery_7029" }
Stevović, S., Beljaković, D.,& Stevović, I.. (2014). Sustainable hydro energy use consequently on cost management. in Sustainable Energy Use and Management Academica Brancusi Publishing House, Târgu-Jiu, Romania., 12. https://hdl.handle.net/21.15107/rcub_machinery_7029
Stevović S, Beljaković D, Stevović I. Sustainable hydro energy use consequently on cost management. in Sustainable Energy Use and Management. 2014;:12. https://hdl.handle.net/21.15107/rcub_machinery_7029 .
Stevović, Svetlana, Beljaković, Dejan, Stevović, Ivan, "Sustainable hydro energy use consequently on cost management" in Sustainable Energy Use and Management (2014):12, https://hdl.handle.net/21.15107/rcub_machinery_7029 .