An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase
2006
Аутори
Petrović, DraganVidaković, Veljko
Ćirić, Zoran
Stojković, Siniša
Benišek, Miroslav
Božić, Ivan
Dragić, Milorad
Zeljić, Milorad
Чланак у часопису (Објављена верзија)
Метаподаци
Приказ свих података о документуАпстракт
The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given.
Кључне речи:
power increasing / measurements / hydro-aggregates / efficiency increasing / calculationsИзвор:
Thermal Science, 2006, 10, 4, 17-32Издавач:
- Univerzitet u Beogradu - Institut za nuklearne nauke Vinča, Beograd
Колекције
Институција/група
Mašinski fakultetTY - JOUR AU - Petrović, Dragan AU - Vidaković, Veljko AU - Ćirić, Zoran AU - Stojković, Siniša AU - Benišek, Miroslav AU - Božić, Ivan AU - Dragić, Milorad AU - Zeljić, Milorad PY - 2006 UR - https://machinery.mas.bg.ac.rs/handle/123456789/619 AB - The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given. PB - Univerzitet u Beogradu - Institut za nuklearne nauke Vinča, Beograd T2 - Thermal Science T1 - An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase EP - 32 IS - 4 SP - 17 VL - 10 UR - https://hdl.handle.net/21.15107/rcub_machinery_619 ER -
@article{ author = "Petrović, Dragan and Vidaković, Veljko and Ćirić, Zoran and Stojković, Siniša and Benišek, Miroslav and Božić, Ivan and Dragić, Milorad and Zeljić, Milorad", year = "2006", abstract = "The revitalization of hydro-aggregates should be performed before the life-time expiry of most their parts. But, as in our practice aggregates have been under exploitation much longer then theoretical life-time advices (40, even 50 years), there is a need to estimate the equipment's condition through more sophisticated monitoring, providing the maximum level of safety and availability with minimum investment expenses, before the revitalization finally takes place. That estimation is based on appropriating calculations and measurements needed to take the competent decision. Results of that analysis can be also useful for estimation of the aggregate's power and parameters after the revitalization. In this paper the results of appropriate calculations and measurements for the Hydropower station HE Zvornik are given.", publisher = "Univerzitet u Beogradu - Institut za nuklearne nauke Vinča, Beograd", journal = "Thermal Science", title = "An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase", pages = "32-17", number = "4", volume = "10", url = "https://hdl.handle.net/21.15107/rcub_machinery_619" }
Petrović, D., Vidaković, V., Ćirić, Z., Stojković, S., Benišek, M., Božić, I., Dragić, M.,& Zeljić, M.. (2006). An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase. in Thermal Science Univerzitet u Beogradu - Institut za nuklearne nauke Vinča, Beograd., 10(4), 17-32. https://hdl.handle.net/21.15107/rcub_machinery_619
Petrović D, Vidaković V, Ćirić Z, Stojković S, Benišek M, Božić I, Dragić M, Zeljić M. An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase. in Thermal Science. 2006;10(4):17-32. https://hdl.handle.net/21.15107/rcub_machinery_619 .
Petrović, Dragan, Vidaković, Veljko, Ćirić, Zoran, Stojković, Siniša, Benišek, Miroslav, Božić, Ivan, Dragić, Milorad, Zeljić, Milorad, "An increase of hydro-aggregate's installed power and efficiency factor before the revitalization phase" in Thermal Science, 10, no. 4 (2006):17-32, https://hdl.handle.net/21.15107/rcub_machinery_619 .