dc.description.abstractThe study recorded data on delays in hydraulic excavators over a period of one year. The observed delays were classified into groups according to the type of cause and the degree of danger was assessed by experts in relation to the safety of the operator, the environment, the failure of the observed machine and financial losses. The Fuzzy FMEA method was applied to prioritize the identified causes of downtime, i.e. risk selection. The result of the research indicates the advantages of incorporating the knowledge and experience of decision makers in the evaluation of FMEA parameters, Severity (S), Occurrence (O), Detection (D) through a semiquantitative approach based on combination of real performance and downtime indicators and linguistic statements for FMEA parameters.sr
dc.language.isoensr
dc.publisherČačak : DQM Research Centersr
dc.rightsrestrictedAccesssr
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.source12th International Conference Life Cycle Engineering and Management ICDQM-2021 : Proceedings, june 24-25, 2021, Prijevor, Serbiasr
dc.subjectrikssr
dc.subjecthydraulic excavatorsr
dc.subjectFuzzy FMEAsr
dc.titleResearch on risk prioritization at hydraulic excavator using fuzzy FMEA methodsr
dc.typeconferenceObjectsr
dc.rights.licenseARRsr
dc.citation.rankM33
dc.identifier.rcubhttps://hdl.handle.net/21.15107/rcub_machinery_4127
dc.type.versionpublishedVersionsr


Документи

Thumbnail

Овај документ се појављује у следећим колекцијама

Приказ основних података о документу