Search
Now showing items 1-10 of 11
Workspace design for crane cabins applying a combined traditional approach and the Taguchi method for design of experiments
(Taylor & Francis Ltd, Abingdon, 2016)
Procedures in the development process of crane cabins are arbitrary and subjective. Since approximately 42% of incidents in the construction industry are linked to them, there is a need to collect fresh anthropometric data ...
Non-Destructive Determination Of Mechanical Properties Of Wood
(Novi Sad: Faculty of Technical Sciences, 2018)
Mechanical properties of wood are defined by its structure. The method of using wood as an element of a constructive assembly is directly dependent on its mechanical properties, including, in particular, resistance to ...
Most Common Pitfalls Within Creation of Project Proposals for EU Funding
(Belgrade: Faculty of Mechanical Engineering, 2015)
In this funding cycle, method of work of EU finan¬cing sources, along with same success rate, remained very similar to previous ones. So far gathered evaluators` experience, demonstrates the presence of same pitfalls in ...
Digital building model: typology and lifecycle management
(Belgrade: STRAND, 2019)
Lately, there is increasing worldwide pressure that data on buildings be stored in the form of digital models. On the market there exist a large number of applications that enable creation of digital building models either ...
Digital vs. Traditional Design Process
(Belgrade: Faculty of Architecture, 2018)
The design process is a theme that has long been a preoccupation for architects. Today, when digital technologies play irreplaceable part in the architectural design it would be expected that the design process had improved ...
BIM – A Tool Not the Principle
(Belgrade: Faculty of Architecture, 2015)
The Building Information Modeling (BIM) was regarded as the revolutionary approach to computer assisted building design, but everyday experience with BIM applications like Revit and ArchiCAD demonstrates inconsistencies ...
Research on possible organizational improvement of sport tourist center as a business system
(ICOPEC, 2017)
Dragonproject is the first tourist surf resort on the Adriatic coast and in Balkans, which now operates as an organized tourist sport and recreation educational ecological center, on two micro-locations in the area of the ...
Uvođenje BIM-a u nastavu na Građevinskom fakultetu Univerziteta u Beogradu
(Novi Sad: Faculty of Technical Sciences, 2018)
Ogroman napredak informacionih tehnologija i sredstava komunikacije poslednjih decenija prožima mnoge sfere društva. U građevinskoj industriji, koju sve više zahvata proces digitalizacije, promene se odslikavaju u načinu ...
The Model in Coded Digital Design Process – Digital Chain Case
(Belgrade: STRAND, 2018)
The process of design and realization in emerging architecture is seen as digitally connected and interfaced. Digital Chain is the central principle we adopted in this research. It is an uninterruptible digital process ...
Digital and Architecture: Still Not a Perfect Match
(Belgrade: STRAND, 2017)
The application of digital technologies in the architectural design has long history of high promises about advances that computers will bring to the practice and relatively low inclusion of the technology in the every day ...