Abstract
Rizik je povezan sa svim projektima, kao i sa svim procesima i odlukama kroz životni vek projekta. Rizik stoga treba da bude upravljan u svim fazama projekta, a proces menadžmenta rizikom treba da bude integrisan i u procese menadžmenta projektom i u procese koji su vezani za proizvod. Možemo reći da je rizik kombinacija učestalosti ili verovatnoće pojavljivanja i posledica određenog "opasnog" događaja. U ovom radu su prikazane mogućnosti poboljšanja jedne od najčešće korišćenih klasičnih metoda analize otkaza - FMEA metode, i to direktnim uključivanjem analize rizika u ovu metodu. U praksi nam je potrebna velika količina energije, vremena i novca da sprovedemo FMEA analizu jednog kompleksnog sistema, te se stoga ulažu veliki napori u pronalaženje modifikovanih, ubrzanih načina za implementaciju ove metode, vodeći pri tome računa da ne izgubimo smisao i koncept analize. Jedan od načina efikasnije primene ove metode je modifikacija FMEA procesa, određivanjem uticaja i frekvencije pojavl...jivanja svakog otkaza. Pokazane su određene nedoslednosti FMEA metode, a koje su vezane za RPN vrednost. Ovo je ilustrovano na primeru analize nosećih konstrukcija autobusa, sa posebnim osvrtom na komparaciju rezultata dobijenih tradicionalnom i modifikovanom metodom.
Risk is associated with every project and with each process and each decision throughout the life of a project. Risk should therefore be managed at each stage of the project and the risk management process should be incorporated with both the project management processes and the product-related processes. We could say that risk is a combination of frequency or occurrence probability and the consequence of a specific hazardous event. In this paper we have presented improvement possibilities of one of the most widely used classical failure analysis methods - FMEA method, by direct inclusion of risk analysis into this method. In practice we need a great deal of energy, time and money to carry out FMEA analysis of a complex system. Therefore, a great deal of effort is being made in finding the modified, accelerated ways for this method implementation, bearing in mind not forgetting the meaning and the concept of the analysis. One of the ways of this method more efficient application is FME...A process modification, by determining the influence and the occurrence frequency of each failure. Certain inconsistencies of FMEA method, which are related to RPN value, have been shown. This is illustrated on the example of bus support structure analysis, with special reference to the comparison of the results obtained by the traditional and modified method.
Keywords:
FMEA metoda / analiza rizika / risk analysis / FMEA methodSource:
Journal of Applied Engineering Science, 2003, 1, 2, 7-14Publisher:
- Institut za istraživanja i projektovanja u privredi, Beograd
Collections
Institution/Community
Mašinski fakultetTY - JOUR AU - Popović, Vladimir PY - 2003 UR - https://machinery.mas.bg.ac.rs/handle/123456789/354 AB - Rizik je povezan sa svim projektima, kao i sa svim procesima i odlukama kroz životni vek projekta. Rizik stoga treba da bude upravljan u svim fazama projekta, a proces menadžmenta rizikom treba da bude integrisan i u procese menadžmenta projektom i u procese koji su vezani za proizvod. Možemo reći da je rizik kombinacija učestalosti ili verovatnoće pojavljivanja i posledica određenog "opasnog" događaja. U ovom radu su prikazane mogućnosti poboljšanja jedne od najčešće korišćenih klasičnih metoda analize otkaza - FMEA metode, i to direktnim uključivanjem analize rizika u ovu metodu. U praksi nam je potrebna velika količina energije, vremena i novca da sprovedemo FMEA analizu jednog kompleksnog sistema, te se stoga ulažu veliki napori u pronalaženje modifikovanih, ubrzanih načina za implementaciju ove metode, vodeći pri tome računa da ne izgubimo smisao i koncept analize. Jedan od načina efikasnije primene ove metode je modifikacija FMEA procesa, određivanjem uticaja i frekvencije pojavljivanja svakog otkaza. Pokazane su određene nedoslednosti FMEA metode, a koje su vezane za RPN vrednost. Ovo je ilustrovano na primeru analize nosećih konstrukcija autobusa, sa posebnim osvrtom na komparaciju rezultata dobijenih tradicionalnom i modifikovanom metodom. AB - Risk is associated with every project and with each process and each decision throughout the life of a project. Risk should therefore be managed at each stage of the project and the risk management process should be incorporated with both the project management processes and the product-related processes. We could say that risk is a combination of frequency or occurrence probability and the consequence of a specific hazardous event. In this paper we have presented improvement possibilities of one of the most widely used classical failure analysis methods - FMEA method, by direct inclusion of risk analysis into this method. In practice we need a great deal of energy, time and money to carry out FMEA analysis of a complex system. Therefore, a great deal of effort is being made in finding the modified, accelerated ways for this method implementation, bearing in mind not forgetting the meaning and the concept of the analysis. One of the ways of this method more efficient application is FMEA process modification, by determining the influence and the occurrence frequency of each failure. Certain inconsistencies of FMEA method, which are related to RPN value, have been shown. This is illustrated on the example of bus support structure analysis, with special reference to the comparison of the results obtained by the traditional and modified method. PB - Institut za istraživanja i projektovanja u privredi, Beograd T2 - Journal of Applied Engineering Science T1 - Analiza rizika i FMEA metoda EP - 14 IS - 2 SP - 7 VL - 1 UR - https://hdl.handle.net/21.15107/rcub_machinery_354 ER -
@article{ author = "Popović, Vladimir", year = "2003", abstract = "Rizik je povezan sa svim projektima, kao i sa svim procesima i odlukama kroz životni vek projekta. Rizik stoga treba da bude upravljan u svim fazama projekta, a proces menadžmenta rizikom treba da bude integrisan i u procese menadžmenta projektom i u procese koji su vezani za proizvod. Možemo reći da je rizik kombinacija učestalosti ili verovatnoće pojavljivanja i posledica određenog "opasnog" događaja. U ovom radu su prikazane mogućnosti poboljšanja jedne od najčešće korišćenih klasičnih metoda analize otkaza - FMEA metode, i to direktnim uključivanjem analize rizika u ovu metodu. U praksi nam je potrebna velika količina energije, vremena i novca da sprovedemo FMEA analizu jednog kompleksnog sistema, te se stoga ulažu veliki napori u pronalaženje modifikovanih, ubrzanih načina za implementaciju ove metode, vodeći pri tome računa da ne izgubimo smisao i koncept analize. Jedan od načina efikasnije primene ove metode je modifikacija FMEA procesa, određivanjem uticaja i frekvencije pojavljivanja svakog otkaza. Pokazane su određene nedoslednosti FMEA metode, a koje su vezane za RPN vrednost. Ovo je ilustrovano na primeru analize nosećih konstrukcija autobusa, sa posebnim osvrtom na komparaciju rezultata dobijenih tradicionalnom i modifikovanom metodom., Risk is associated with every project and with each process and each decision throughout the life of a project. Risk should therefore be managed at each stage of the project and the risk management process should be incorporated with both the project management processes and the product-related processes. We could say that risk is a combination of frequency or occurrence probability and the consequence of a specific hazardous event. In this paper we have presented improvement possibilities of one of the most widely used classical failure analysis methods - FMEA method, by direct inclusion of risk analysis into this method. In practice we need a great deal of energy, time and money to carry out FMEA analysis of a complex system. Therefore, a great deal of effort is being made in finding the modified, accelerated ways for this method implementation, bearing in mind not forgetting the meaning and the concept of the analysis. One of the ways of this method more efficient application is FMEA process modification, by determining the influence and the occurrence frequency of each failure. Certain inconsistencies of FMEA method, which are related to RPN value, have been shown. This is illustrated on the example of bus support structure analysis, with special reference to the comparison of the results obtained by the traditional and modified method.", publisher = "Institut za istraživanja i projektovanja u privredi, Beograd", journal = "Journal of Applied Engineering Science", title = "Analiza rizika i FMEA metoda", pages = "14-7", number = "2", volume = "1", url = "https://hdl.handle.net/21.15107/rcub_machinery_354" }
Popović, V.. (2003). Analiza rizika i FMEA metoda. in Journal of Applied Engineering Science Institut za istraživanja i projektovanja u privredi, Beograd., 1(2), 7-14. https://hdl.handle.net/21.15107/rcub_machinery_354
Popović V. Analiza rizika i FMEA metoda. in Journal of Applied Engineering Science. 2003;1(2):7-14. https://hdl.handle.net/21.15107/rcub_machinery_354 .
Popović, Vladimir, "Analiza rizika i FMEA metoda" in Journal of Applied Engineering Science, 1, no. 2 (2003):7-14, https://hdl.handle.net/21.15107/rcub_machinery_354 .