Human factor risk management procedures applied in the case of open pit mine
Само за регистроване кориснике
2021
Аутори
Kirin, SnežanaSedmak, Aleksandar
Li, Wei
Brzaković, Miodrag
Miljanović, Igor
Petrović, Ana
Sedmak, Simon
Чланак у часопису (Објављена верзија)
Метаподаци
Приказ свих података о документуАпстракт
Risk management aims to provide a controlled work environment to ensure the safe operation of the high-risk systems. It is a dynamic process which work in a continual state of change. The issue of human factor risk and rules and regulations in open pit mine is a main focus of this paper in order to develop predictive models of behavior of workers in relation to compliance with the procedures and rules. Presented survey was conducted in open pit coal mine, as high-risk system, involving 476 mineworkers. The survey was in the form of a questionnaire, consisting of approximately 45 questions. It aimed to find out the opinions of the mining workforce about risk attitude generally as well as about safety rules and regulations. The first goal was to determine factor with the biggest influence on risk of human factor. The second goal was creation model for prediction behavior of mining workers. The survey also aimed to examine: (a) major human risk factors at a specific open-pit mine site (b)... mine workers' opinions about policies and procedures; (c) the manner in which mine safety rules and regulations are perceived and understood; (d) the frequency of deviation from rules and regulations; (e) attitudes related to risk taking and their interaction with rules and regulations; and (f) anticipate the behavior of mining workers with respect to compliance with policies and procedures. In addition, a case study is presented, related to failure of mining equipment, the SchRs 630 bucket wheel excavator, which had occurred due to excessive loads caused by a human factor, such as inadequate operation of the equipment. The goal here was to further relate the effects of the human factor to the structural integrity, by providing a reliable numerical model which could be used to determine the critical locations where failures could occur, and by combining this approach with the previously described risk analysis methodology, structure safety can be improved.
Кључне речи:
Risk management / Human factor / Finite element method / Bucket wheel excavatorИзвор:
Engineering Failure Analysis, 2021, 126Издавач:
- Pergamon-Elsevier Science Ltd, Oxford
DOI: 10.1016/j.engfailanal.2021.105456
ISSN: 1350-6307
WoS: 000663551200003
Scopus: 2-s2.0-85107037129
Институција/група
Inovacioni centarTY - JOUR AU - Kirin, Snežana AU - Sedmak, Aleksandar AU - Li, Wei AU - Brzaković, Miodrag AU - Miljanović, Igor AU - Petrović, Ana AU - Sedmak, Simon PY - 2021 UR - https://machinery.mas.bg.ac.rs/handle/123456789/3509 AB - Risk management aims to provide a controlled work environment to ensure the safe operation of the high-risk systems. It is a dynamic process which work in a continual state of change. The issue of human factor risk and rules and regulations in open pit mine is a main focus of this paper in order to develop predictive models of behavior of workers in relation to compliance with the procedures and rules. Presented survey was conducted in open pit coal mine, as high-risk system, involving 476 mineworkers. The survey was in the form of a questionnaire, consisting of approximately 45 questions. It aimed to find out the opinions of the mining workforce about risk attitude generally as well as about safety rules and regulations. The first goal was to determine factor with the biggest influence on risk of human factor. The second goal was creation model for prediction behavior of mining workers. The survey also aimed to examine: (a) major human risk factors at a specific open-pit mine site (b) mine workers' opinions about policies and procedures; (c) the manner in which mine safety rules and regulations are perceived and understood; (d) the frequency of deviation from rules and regulations; (e) attitudes related to risk taking and their interaction with rules and regulations; and (f) anticipate the behavior of mining workers with respect to compliance with policies and procedures. In addition, a case study is presented, related to failure of mining equipment, the SchRs 630 bucket wheel excavator, which had occurred due to excessive loads caused by a human factor, such as inadequate operation of the equipment. The goal here was to further relate the effects of the human factor to the structural integrity, by providing a reliable numerical model which could be used to determine the critical locations where failures could occur, and by combining this approach with the previously described risk analysis methodology, structure safety can be improved. PB - Pergamon-Elsevier Science Ltd, Oxford T2 - Engineering Failure Analysis T1 - Human factor risk management procedures applied in the case of open pit mine VL - 126 DO - 10.1016/j.engfailanal.2021.105456 ER -
@article{ author = "Kirin, Snežana and Sedmak, Aleksandar and Li, Wei and Brzaković, Miodrag and Miljanović, Igor and Petrović, Ana and Sedmak, Simon", year = "2021", abstract = "Risk management aims to provide a controlled work environment to ensure the safe operation of the high-risk systems. It is a dynamic process which work in a continual state of change. The issue of human factor risk and rules and regulations in open pit mine is a main focus of this paper in order to develop predictive models of behavior of workers in relation to compliance with the procedures and rules. Presented survey was conducted in open pit coal mine, as high-risk system, involving 476 mineworkers. The survey was in the form of a questionnaire, consisting of approximately 45 questions. It aimed to find out the opinions of the mining workforce about risk attitude generally as well as about safety rules and regulations. The first goal was to determine factor with the biggest influence on risk of human factor. The second goal was creation model for prediction behavior of mining workers. The survey also aimed to examine: (a) major human risk factors at a specific open-pit mine site (b) mine workers' opinions about policies and procedures; (c) the manner in which mine safety rules and regulations are perceived and understood; (d) the frequency of deviation from rules and regulations; (e) attitudes related to risk taking and their interaction with rules and regulations; and (f) anticipate the behavior of mining workers with respect to compliance with policies and procedures. In addition, a case study is presented, related to failure of mining equipment, the SchRs 630 bucket wheel excavator, which had occurred due to excessive loads caused by a human factor, such as inadequate operation of the equipment. The goal here was to further relate the effects of the human factor to the structural integrity, by providing a reliable numerical model which could be used to determine the critical locations where failures could occur, and by combining this approach with the previously described risk analysis methodology, structure safety can be improved.", publisher = "Pergamon-Elsevier Science Ltd, Oxford", journal = "Engineering Failure Analysis", title = "Human factor risk management procedures applied in the case of open pit mine", volume = "126", doi = "10.1016/j.engfailanal.2021.105456" }
Kirin, S., Sedmak, A., Li, W., Brzaković, M., Miljanović, I., Petrović, A.,& Sedmak, S.. (2021). Human factor risk management procedures applied in the case of open pit mine. in Engineering Failure Analysis Pergamon-Elsevier Science Ltd, Oxford., 126. https://doi.org/10.1016/j.engfailanal.2021.105456
Kirin S, Sedmak A, Li W, Brzaković M, Miljanović I, Petrović A, Sedmak S. Human factor risk management procedures applied in the case of open pit mine. in Engineering Failure Analysis. 2021;126. doi:10.1016/j.engfailanal.2021.105456 .
Kirin, Snežana, Sedmak, Aleksandar, Li, Wei, Brzaković, Miodrag, Miljanović, Igor, Petrović, Ana, Sedmak, Simon, "Human factor risk management procedures applied in the case of open pit mine" in Engineering Failure Analysis, 126 (2021), https://doi.org/10.1016/j.engfailanal.2021.105456 . .