Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit
Апстракт
Rotary excavators as the basic machines at the open pits of lignite operate in very difficult working conditions, where they are constantly expected to be highly productive, reliable, available and safe as the production carriers. Determining the availability as well as the duration and number of failures using the analytical methods allows to analyze the key influencing factors on their occurrence and values of these parameters and to determine the essential elements of system maintenance and management in order to optimize them.
Кључне речи:
rotary excavator / reliability / convenience of maintenance / availabilityИзвор:
Mining and Metallurgy Engineering Bor, 2020, 3-4, 25-36Издавач:
- Institut za rudarstvo i metalurgiju, Bor
Финансирање / пројекти:
- Министарство науке, технолошког развоја и иновација Републике Србије, институционално финансирање - 200052 (Институт за рударство и металургију, Бор) (RS-MESTD-inst-2020-200052)
Колекције
Институција/група
Mašinski fakultetTY - JOUR AU - Bugarić, Uglješa AU - Tanasijević, Miloš AU - Gomilanović, Miljan AU - Petrović, Andrija AU - Ilić, Miloš PY - 2020 UR - https://machinery.mas.bg.ac.rs/handle/123456789/3354 AB - Rotary excavators as the basic machines at the open pits of lignite operate in very difficult working conditions, where they are constantly expected to be highly productive, reliable, available and safe as the production carriers. Determining the availability as well as the duration and number of failures using the analytical methods allows to analyze the key influencing factors on their occurrence and values of these parameters and to determine the essential elements of system maintenance and management in order to optimize them. PB - Institut za rudarstvo i metalurgiju, Bor T2 - Mining and Metallurgy Engineering Bor T1 - Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit EP - 36 IS - 3-4 SP - 25 DO - 10.5937/mmeb2004025B ER -
@article{ author = "Bugarić, Uglješa and Tanasijević, Miloš and Gomilanović, Miljan and Petrović, Andrija and Ilić, Miloš", year = "2020", abstract = "Rotary excavators as the basic machines at the open pits of lignite operate in very difficult working conditions, where they are constantly expected to be highly productive, reliable, available and safe as the production carriers. Determining the availability as well as the duration and number of failures using the analytical methods allows to analyze the key influencing factors on their occurrence and values of these parameters and to determine the essential elements of system maintenance and management in order to optimize them.", publisher = "Institut za rudarstvo i metalurgiju, Bor", journal = "Mining and Metallurgy Engineering Bor", title = "Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit", pages = "36-25", number = "3-4", doi = "10.5937/mmeb2004025B" }
Bugarić, U., Tanasijević, M., Gomilanović, M., Petrović, A.,& Ilić, M.. (2020). Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit. in Mining and Metallurgy Engineering Bor Institut za rudarstvo i metalurgiju, Bor.(3-4), 25-36. https://doi.org/10.5937/mmeb2004025B
Bugarić U, Tanasijević M, Gomilanović M, Petrović A, Ilić M. Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit. in Mining and Metallurgy Engineering Bor. 2020;(3-4):25-36. doi:10.5937/mmeb2004025B .
Bugarić, Uglješa, Tanasijević, Miloš, Gomilanović, Miljan, Petrović, Andrija, Ilić, Miloš, "Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit" in Mining and Metallurgy Engineering Bor, no. 3-4 (2020):25-36, https://doi.org/10.5937/mmeb2004025B . .