The impact of a hydroelectric power station on the development and modernization of the Bajina Bašta settlement during the socialist period
Апстракт
During the process of socialist modernization, initiated after WWII, large development projects in Serbia were the main drivers of urban transformation. Electrification and industrialization resulted in the establishment of new production modes, which defined a new socio-economic background for the development of settlements and the modification of their functional and morphological structure. The construction of the Bajina Bašta hydroelectric power station, in the middle section of the Drina River in western Serbia, was one of the development projects, and it triggered the transformation of the environment, upgrading the pre-war small town of Bajina Bašta into a new urban node, adjusted to the socialist imperatives and standards of progress.
Кључне речи:
Urban development / Socialist modernization / Hydroelectric power station / Bajina Bašta settlementИзвор:
Spatium, 2018, 39, 47-54Издавач:
- Institut za arhitekturu i urbanizam Srbije, Beograd
Колекције
Институција/група
Inovacioni centarTY - JOUR AU - Vučetić, Ivana PY - 2018 UR - https://machinery.mas.bg.ac.rs/handle/123456789/2949 AB - During the process of socialist modernization, initiated after WWII, large development projects in Serbia were the main drivers of urban transformation. Electrification and industrialization resulted in the establishment of new production modes, which defined a new socio-economic background for the development of settlements and the modification of their functional and morphological structure. The construction of the Bajina Bašta hydroelectric power station, in the middle section of the Drina River in western Serbia, was one of the development projects, and it triggered the transformation of the environment, upgrading the pre-war small town of Bajina Bašta into a new urban node, adjusted to the socialist imperatives and standards of progress. PB - Institut za arhitekturu i urbanizam Srbije, Beograd T2 - Spatium T1 - The impact of a hydroelectric power station on the development and modernization of the Bajina Bašta settlement during the socialist period EP - 54 IS - 39 SP - 47 DO - 10.2298/SPAT1839047V ER -
@article{ author = "Vučetić, Ivana", year = "2018", abstract = "During the process of socialist modernization, initiated after WWII, large development projects in Serbia were the main drivers of urban transformation. Electrification and industrialization resulted in the establishment of new production modes, which defined a new socio-economic background for the development of settlements and the modification of their functional and morphological structure. The construction of the Bajina Bašta hydroelectric power station, in the middle section of the Drina River in western Serbia, was one of the development projects, and it triggered the transformation of the environment, upgrading the pre-war small town of Bajina Bašta into a new urban node, adjusted to the socialist imperatives and standards of progress.", publisher = "Institut za arhitekturu i urbanizam Srbije, Beograd", journal = "Spatium", title = "The impact of a hydroelectric power station on the development and modernization of the Bajina Bašta settlement during the socialist period", pages = "54-47", number = "39", doi = "10.2298/SPAT1839047V" }
Vučetić, I.. (2018). The impact of a hydroelectric power station on the development and modernization of the Bajina Bašta settlement during the socialist period. in Spatium Institut za arhitekturu i urbanizam Srbije, Beograd.(39), 47-54. https://doi.org/10.2298/SPAT1839047V
Vučetić I. The impact of a hydroelectric power station on the development and modernization of the Bajina Bašta settlement during the socialist period. in Spatium. 2018;(39):47-54. doi:10.2298/SPAT1839047V .
Vučetić, Ivana, "The impact of a hydroelectric power station on the development and modernization of the Bajina Bašta settlement during the socialist period" in Spatium, no. 39 (2018):47-54, https://doi.org/10.2298/SPAT1839047V . .