The production cycle (PC) time, as a very important economic indicator of freezing current assets, involves the time needed to manufacture a unit or a series of units, from putting them into production until they are put into storage; and yet it is rarely discussed in the literature, even though it should be also analysed and be made as short as possible. The goal of this article is to survey and control the methodology of reducing the PC time of components in the metalworking industry, grouped by factor analysis into the factors of production and non-production components, observed by a modified method of current observations, and viewed as a process whose effectiveness was monitored using control charts. The survey is based on data collected through 1,576 observations in a Serbian company that manufactures electrical and electronic equipment for motor vehicles. The 2012 results, when compared with those of 2011, indicate that the PC time is significantly reduced by 93 minutes, or by ...28.53 per cent, and the manufacturing time by 46 minutes, or by 19.17 per cent. The results furnish empirical findings that provide insights into a number of managerial issues concerning investment decisions in product-specific cycle time improvements and reductions, together with process redesigns.
Извор:
South African Journal of Industrial Engineering, 2016, 27, 1, 178-191Издавач:
- Southern African Inst Industrial Engineering, Pretoria
Финансирање / пројекти:
DOI: 10.7166/27-1-969
ISSN: 2224-7890
WoS: 000375962200015
Scopus: 2-s2.0-84970016359
Институција/група
Inovacioni centarTY - JOUR AU - Spasojević Brkić, Vesna AU - Klarin, Milivoj AU - Stanisavljev, Sanja AU - Brkić, Aleksandar AU - Sajfert, Zvonko PY - 2016 UR - https://machinery.mas.bg.ac.rs/handle/123456789/2404 AB - The production cycle (PC) time, as a very important economic indicator of freezing current assets, involves the time needed to manufacture a unit or a series of units, from putting them into production until they are put into storage; and yet it is rarely discussed in the literature, even though it should be also analysed and be made as short as possible. The goal of this article is to survey and control the methodology of reducing the PC time of components in the metalworking industry, grouped by factor analysis into the factors of production and non-production components, observed by a modified method of current observations, and viewed as a process whose effectiveness was monitored using control charts. The survey is based on data collected through 1,576 observations in a Serbian company that manufactures electrical and electronic equipment for motor vehicles. The 2012 results, when compared with those of 2011, indicate that the PC time is significantly reduced by 93 minutes, or by 28.53 per cent, and the manufacturing time by 46 minutes, or by 19.17 per cent. The results furnish empirical findings that provide insights into a number of managerial issues concerning investment decisions in product-specific cycle time improvements and reductions, together with process redesigns. PB - Southern African Inst Industrial Engineering, Pretoria T2 - South African Journal of Industrial Engineering T1 - Reduction of production cycle time by optimising production and non-production components of time in the metalworking industry: a case study EP - 191 IS - 1 SP - 178 VL - 27 DO - 10.7166/27-1-969 ER -
@article{ author = "Spasojević Brkić, Vesna and Klarin, Milivoj and Stanisavljev, Sanja and Brkić, Aleksandar and Sajfert, Zvonko", year = "2016", abstract = "The production cycle (PC) time, as a very important economic indicator of freezing current assets, involves the time needed to manufacture a unit or a series of units, from putting them into production until they are put into storage; and yet it is rarely discussed in the literature, even though it should be also analysed and be made as short as possible. The goal of this article is to survey and control the methodology of reducing the PC time of components in the metalworking industry, grouped by factor analysis into the factors of production and non-production components, observed by a modified method of current observations, and viewed as a process whose effectiveness was monitored using control charts. The survey is based on data collected through 1,576 observations in a Serbian company that manufactures electrical and electronic equipment for motor vehicles. The 2012 results, when compared with those of 2011, indicate that the PC time is significantly reduced by 93 minutes, or by 28.53 per cent, and the manufacturing time by 46 minutes, or by 19.17 per cent. The results furnish empirical findings that provide insights into a number of managerial issues concerning investment decisions in product-specific cycle time improvements and reductions, together with process redesigns.", publisher = "Southern African Inst Industrial Engineering, Pretoria", journal = "South African Journal of Industrial Engineering", title = "Reduction of production cycle time by optimising production and non-production components of time in the metalworking industry: a case study", pages = "191-178", number = "1", volume = "27", doi = "10.7166/27-1-969" }
Spasojević Brkić, V., Klarin, M., Stanisavljev, S., Brkić, A.,& Sajfert, Z.. (2016). Reduction of production cycle time by optimising production and non-production components of time in the metalworking industry: a case study. in South African Journal of Industrial Engineering Southern African Inst Industrial Engineering, Pretoria., 27(1), 178-191. https://doi.org/10.7166/27-1-969
Spasojević Brkić V, Klarin M, Stanisavljev S, Brkić A, Sajfert Z. Reduction of production cycle time by optimising production and non-production components of time in the metalworking industry: a case study. in South African Journal of Industrial Engineering. 2016;27(1):178-191. doi:10.7166/27-1-969 .
Spasojević Brkić, Vesna, Klarin, Milivoj, Stanisavljev, Sanja, Brkić, Aleksandar, Sajfert, Zvonko, "Reduction of production cycle time by optimising production and non-production components of time in the metalworking industry: a case study" in South African Journal of Industrial Engineering, 27, no. 1 (2016):178-191, https://doi.org/10.7166/27-1-969 . .