Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry
Апстракт
The paper presents an original method of determining the elements of the production cycle time by using the modified work sampling method applied to a textile factory. It is shown that the movement of the elements of time can be viewed as a process and in the mathematical sense can establish control limits of error of +/- 3 SD. The mean time of the production cycle of the groups created by the number of pieces in the series t(pcu) moving the hyperbolic function, which has the asymptote c, a function of the form (t) over bar (pcu) = c + b/log n, where all groups of the production cycle in the mathematical sense do not act like strata but are function tpci, related to technology and deterministic factors of the production series.
Кључне речи:
work sampling / textile industry / stochastic model / production cycle / production cycle timeИзвор:
Fibres & Textiles in Eastern Europe, 2015, 23, 5, 23-29Издавач:
- Inst Chemical Fibres, Lodz
Финансирање / пројекти:
- Развој стохастичког модела утврђивања елемената времена рада производног циклуса и њихова оптимизација за серијску производњу у металопрерађивачкој индустрији и у процесима рециклаже (RS-MESTD-Technological Development (TD or TR)-35017)
DOI: 10.5604/12303666.1161752
ISSN: 1230-3666
WoS: 000361080800004
Scopus: 2-s2.0-84940651847
Колекције
Институција/група
Mašinski fakultetTY - JOUR AU - Stanisavljev, Sanja AU - Ćoćkalo, Dragan AU - Klarin, Milivoj AU - Spasojević Brkić, Vesna AU - Đorđević, Dejan PY - 2015 UR - https://machinery.mas.bg.ac.rs/handle/123456789/2248 AB - The paper presents an original method of determining the elements of the production cycle time by using the modified work sampling method applied to a textile factory. It is shown that the movement of the elements of time can be viewed as a process and in the mathematical sense can establish control limits of error of +/- 3 SD. The mean time of the production cycle of the groups created by the number of pieces in the series t(pcu) moving the hyperbolic function, which has the asymptote c, a function of the form (t) over bar (pcu) = c + b/log n, where all groups of the production cycle in the mathematical sense do not act like strata but are function tpci, related to technology and deterministic factors of the production series. PB - Inst Chemical Fibres, Lodz T2 - Fibres & Textiles in Eastern Europe T1 - Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry EP - 29 IS - 5 SP - 23 VL - 23 DO - 10.5604/12303666.1161752 ER -
@article{ author = "Stanisavljev, Sanja and Ćoćkalo, Dragan and Klarin, Milivoj and Spasojević Brkić, Vesna and Đorđević, Dejan", year = "2015", abstract = "The paper presents an original method of determining the elements of the production cycle time by using the modified work sampling method applied to a textile factory. It is shown that the movement of the elements of time can be viewed as a process and in the mathematical sense can establish control limits of error of +/- 3 SD. The mean time of the production cycle of the groups created by the number of pieces in the series t(pcu) moving the hyperbolic function, which has the asymptote c, a function of the form (t) over bar (pcu) = c + b/log n, where all groups of the production cycle in the mathematical sense do not act like strata but are function tpci, related to technology and deterministic factors of the production series.", publisher = "Inst Chemical Fibres, Lodz", journal = "Fibres & Textiles in Eastern Europe", title = "Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry", pages = "29-23", number = "5", volume = "23", doi = "10.5604/12303666.1161752" }
Stanisavljev, S., Ćoćkalo, D., Klarin, M., Spasojević Brkić, V.,& Đorđević, D.. (2015). Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry. in Fibres & Textiles in Eastern Europe Inst Chemical Fibres, Lodz., 23(5), 23-29. https://doi.org/10.5604/12303666.1161752
Stanisavljev S, Ćoćkalo D, Klarin M, Spasojević Brkić V, Đorđević D. Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry. in Fibres & Textiles in Eastern Europe. 2015;23(5):23-29. doi:10.5604/12303666.1161752 .
Stanisavljev, Sanja, Ćoćkalo, Dragan, Klarin, Milivoj, Spasojević Brkić, Vesna, Đorđević, Dejan, "Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry" in Fibres & Textiles in Eastern Europe, 23, no. 5 (2015):23-29, https://doi.org/10.5604/12303666.1161752 . .