Improvement of auxiliary mechanization operations management at an open-pit coal mine based on a process approach with ICT support
Samo za registrovane korisnike
2013
Autori
Pantelić, S.D.Ivanović, Gradimir
Mitrović, Radivoje
Jovanović, D.
Stošić, D.
Dimitrijević, S.
Članak u časopisu (Objavljena verzija)
Metapodaci
Prikaz svih podataka o dokumentuApstrakt
This paper presents a modern systematic approach to the improvement of the management system for auxiliary mechanization operations at an open-pit coal mine. The approach is based on an integrated model (IM) of business processes and information systems (IS). Within IS/ICT system development, implementation of GPS/GPRS technologies is also described in this paper. Experimental research on this holistic approach was performed at the thermal power plants and open-pit coal mines in Kostolac, Serbia. Results confirmed the importance of this concept for auxiliary mechanization operations management based on selected KPIs (e.g. working moto-hours of the machine) and technical parameters (e.g. readiness).
Ključne reči:
KPIs / ICT system / GPS/GPRS technologies / Auxiliary mechanizationIzvor:
Advanced Materials Research, 2013, 633, 322-335Izdavač:
- Trans Tech Publications Ltd
Finansiranje / projekti:
- Razvoj, projektovanje i implementacija savremenih strategija integrisanog upravljanja operativnim radom i održavanjem vozila i mehanizacije u sistemima autotransporta, rudarstva i energetike (RS-MESTD-Technological Development (TD or TR)-35030)
DOI: 10.4028/www.scientific.net/AMR.633.322
ISSN: 1022-6680
Scopus: 2-s2.0-84873054687
Kolekcije
Institucija/grupa
Mašinski fakultetTY - JOUR AU - Pantelić, S.D. AU - Ivanović, Gradimir AU - Mitrović, Radivoje AU - Jovanović, D. AU - Stošić, D. AU - Dimitrijević, S. PY - 2013 UR - https://machinery.mas.bg.ac.rs/handle/123456789/1816 AB - This paper presents a modern systematic approach to the improvement of the management system for auxiliary mechanization operations at an open-pit coal mine. The approach is based on an integrated model (IM) of business processes and information systems (IS). Within IS/ICT system development, implementation of GPS/GPRS technologies is also described in this paper. Experimental research on this holistic approach was performed at the thermal power plants and open-pit coal mines in Kostolac, Serbia. Results confirmed the importance of this concept for auxiliary mechanization operations management based on selected KPIs (e.g. working moto-hours of the machine) and technical parameters (e.g. readiness). PB - Trans Tech Publications Ltd T2 - Advanced Materials Research T1 - Improvement of auxiliary mechanization operations management at an open-pit coal mine based on a process approach with ICT support EP - 335 SP - 322 VL - 633 DO - 10.4028/www.scientific.net/AMR.633.322 ER -
@article{ author = "Pantelić, S.D. and Ivanović, Gradimir and Mitrović, Radivoje and Jovanović, D. and Stošić, D. and Dimitrijević, S.", year = "2013", abstract = "This paper presents a modern systematic approach to the improvement of the management system for auxiliary mechanization operations at an open-pit coal mine. The approach is based on an integrated model (IM) of business processes and information systems (IS). Within IS/ICT system development, implementation of GPS/GPRS technologies is also described in this paper. Experimental research on this holistic approach was performed at the thermal power plants and open-pit coal mines in Kostolac, Serbia. Results confirmed the importance of this concept for auxiliary mechanization operations management based on selected KPIs (e.g. working moto-hours of the machine) and technical parameters (e.g. readiness).", publisher = "Trans Tech Publications Ltd", journal = "Advanced Materials Research", title = "Improvement of auxiliary mechanization operations management at an open-pit coal mine based on a process approach with ICT support", pages = "335-322", volume = "633", doi = "10.4028/www.scientific.net/AMR.633.322" }
Pantelić, S.D., Ivanović, G., Mitrović, R., Jovanović, D., Stošić, D.,& Dimitrijević, S.. (2013). Improvement of auxiliary mechanization operations management at an open-pit coal mine based on a process approach with ICT support. in Advanced Materials Research Trans Tech Publications Ltd., 633, 322-335. https://doi.org/10.4028/www.scientific.net/AMR.633.322
Pantelić S, Ivanović G, Mitrović R, Jovanović D, Stošić D, Dimitrijević S. Improvement of auxiliary mechanization operations management at an open-pit coal mine based on a process approach with ICT support. in Advanced Materials Research. 2013;633:322-335. doi:10.4028/www.scientific.net/AMR.633.322 .
Pantelić, S.D., Ivanović, Gradimir, Mitrović, Radivoje, Jovanović, D., Stošić, D., Dimitrijević, S., "Improvement of auxiliary mechanization operations management at an open-pit coal mine based on a process approach with ICT support" in Advanced Materials Research, 633 (2013):322-335, https://doi.org/10.4028/www.scientific.net/AMR.633.322 . .