Приказ основних података о документу

dc.creatorPetković, Zoran D.
dc.creatorBošnjak, Srđan
dc.creatorGašić, Vlada
dc.date.accessioned2022-09-19T16:36:06Z
dc.date.available2022-09-19T16:36:06Z
dc.date.issued2011
dc.identifier.issn1821-1259
dc.identifier.urihttps://machinery.mas.bg.ac.rs/handle/123456789/1184
dc.description.abstractDesign flaws in the positioning of the tribune supporting structures inside the Belgrade Arena hall prevented adequate usage of internal logistic capabilities. This paper deals with a performed redesign of the tribune supporting structure which resolved the flaws and enabled full functionality of the hall while adhering to safety regulations. Besides FEA, the validation of the tribune structure redesign is also confirmed by a multi-year failure-free tribune usage after the reconstruction. .en
dc.publisherUniverzitet u Novom Sadu - Fakultet tehničkih nauka, Novi Sad
dc.rightsopenAccess
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.sourceMachine Design
dc.subjecttribune structureen
dc.subjectredesignen
dc.subjectFEMen
dc.titleRedesign of the tribune structure in the Belgrade arena hallen
dc.typearticle
dc.rights.licenseBY
dc.citation.epage46
dc.citation.issue1
dc.citation.other3(1): 41-46
dc.citation.spage41
dc.citation.volume3
dc.identifier.rcubhttps://hdl.handle.net/21.15107/rcub_machinery_1184
dc.type.versionpublishedVersion


Документи

ДатотекеВеличинаФорматПреглед

Уз овај запис нема датотека.

Овај документ се појављује у следећим колекцијама

Приказ основних података о документу