A method to assess capacity utilization in short cycle functional layouts
Само за регистроване кориснике
2010
Аутори
Klarin, MilivojMilanović, Dragan
Misita, Mirjana
Spasojević Brkić, Vesna
Jovović, Aleksandar
Чланак у часопису (Објављена верзија)
Метаподаци
Приказ свих података о документуАпстракт
The aim of this article is to indicate that methods of monitoring capacity utilization applied in the processing industry such as cement production can be used in the metalworking industry that has a high level of capacity utilization. The process approach to establishing the level of capacity utilization can be employed in conditions of balanced line production, or when there are components of large-scale production, as well as short production cycles. The results of the analysis indicate that when the level of capacity utilization is high, this variable can be observed per day as stochastic, while, per machine, it can be a random variable. In the metalworking industry it is possible to monitor a larger number of factors related to operating and not operating machines, whereas in the processing industry the factor of work is generally only a single-machining time and factors of not operating are connected only to breakdowns or regular maintenance. To monitor capacity utilization in th...e processing industry, it is possible to apply a work-sampling method as well as the continual streaming method. The possibility common for both industries is to represent the monitoring of capacity utilization over time and to test the mastering of that stochastic function via control limits that are optimal when defined by 2SD.
Кључне речи:
work sampling / level of capacity utilizationИзвор:
Proceedings of The Institution of Mechanical Engineers Part E-Journal of Process Mechanical Engineer, 2010, 224, E1, 49-58Издавач:
- Sage Publications Ltd, London
Финансирање / пројекти:
- Управљање производњом помоћу наруџбина (RS-MESTD-MPN2006-2010-14011)
DOI: 10.1243/09544089JPME280
ISSN: 0954-4089
WoS: 000276361200005
Scopus: 2-s2.0-77649243757
Колекције
Институција/група
Mašinski fakultetTY - JOUR AU - Klarin, Milivoj AU - Milanović, Dragan AU - Misita, Mirjana AU - Spasojević Brkić, Vesna AU - Jovović, Aleksandar PY - 2010 UR - https://machinery.mas.bg.ac.rs/handle/123456789/1120 AB - The aim of this article is to indicate that methods of monitoring capacity utilization applied in the processing industry such as cement production can be used in the metalworking industry that has a high level of capacity utilization. The process approach to establishing the level of capacity utilization can be employed in conditions of balanced line production, or when there are components of large-scale production, as well as short production cycles. The results of the analysis indicate that when the level of capacity utilization is high, this variable can be observed per day as stochastic, while, per machine, it can be a random variable. In the metalworking industry it is possible to monitor a larger number of factors related to operating and not operating machines, whereas in the processing industry the factor of work is generally only a single-machining time and factors of not operating are connected only to breakdowns or regular maintenance. To monitor capacity utilization in the processing industry, it is possible to apply a work-sampling method as well as the continual streaming method. The possibility common for both industries is to represent the monitoring of capacity utilization over time and to test the mastering of that stochastic function via control limits that are optimal when defined by 2SD. PB - Sage Publications Ltd, London T2 - Proceedings of The Institution of Mechanical Engineers Part E-Journal of Process Mechanical Engineer T1 - A method to assess capacity utilization in short cycle functional layouts EP - 58 IS - E1 SP - 49 VL - 224 DO - 10.1243/09544089JPME280 ER -
@article{ author = "Klarin, Milivoj and Milanović, Dragan and Misita, Mirjana and Spasojević Brkić, Vesna and Jovović, Aleksandar", year = "2010", abstract = "The aim of this article is to indicate that methods of monitoring capacity utilization applied in the processing industry such as cement production can be used in the metalworking industry that has a high level of capacity utilization. The process approach to establishing the level of capacity utilization can be employed in conditions of balanced line production, or when there are components of large-scale production, as well as short production cycles. The results of the analysis indicate that when the level of capacity utilization is high, this variable can be observed per day as stochastic, while, per machine, it can be a random variable. In the metalworking industry it is possible to monitor a larger number of factors related to operating and not operating machines, whereas in the processing industry the factor of work is generally only a single-machining time and factors of not operating are connected only to breakdowns or regular maintenance. To monitor capacity utilization in the processing industry, it is possible to apply a work-sampling method as well as the continual streaming method. The possibility common for both industries is to represent the monitoring of capacity utilization over time and to test the mastering of that stochastic function via control limits that are optimal when defined by 2SD.", publisher = "Sage Publications Ltd, London", journal = "Proceedings of The Institution of Mechanical Engineers Part E-Journal of Process Mechanical Engineer", title = "A method to assess capacity utilization in short cycle functional layouts", pages = "58-49", number = "E1", volume = "224", doi = "10.1243/09544089JPME280" }
Klarin, M., Milanović, D., Misita, M., Spasojević Brkić, V.,& Jovović, A.. (2010). A method to assess capacity utilization in short cycle functional layouts. in Proceedings of The Institution of Mechanical Engineers Part E-Journal of Process Mechanical Engineer Sage Publications Ltd, London., 224(E1), 49-58. https://doi.org/10.1243/09544089JPME280
Klarin M, Milanović D, Misita M, Spasojević Brkić V, Jovović A. A method to assess capacity utilization in short cycle functional layouts. in Proceedings of The Institution of Mechanical Engineers Part E-Journal of Process Mechanical Engineer. 2010;224(E1):49-58. doi:10.1243/09544089JPME280 .
Klarin, Milivoj, Milanović, Dragan, Misita, Mirjana, Spasojević Brkić, Vesna, Jovović, Aleksandar, "A method to assess capacity utilization in short cycle functional layouts" in Proceedings of The Institution of Mechanical Engineers Part E-Journal of Process Mechanical Engineer, 224, no. E1 (2010):49-58, https://doi.org/10.1243/09544089JPME280 . .