Show simple item record

dc.creatorVilotijević, Vidosava
dc.creatorKaradžić, Uroš
dc.creatorBožić, Ivan
dc.creatorIlić, Jovan
dc.date.accessioned2023-03-15T19:28:21Z
dc.date.available2023-03-15T19:28:21Z
dc.date.issued2019
dc.identifier.isbn978-99938-39-85-9
dc.identifier.urihttps://machinery.mas.bg.ac.rs/handle/123456789/6410
dc.description.abstractThe basic parameters for determining and calclulation of installed capacity and energy production of the small hydro power plant (SHPP) are design discharge and net head. The SHPP installed parameter Ki is the ratio of the design discharge and averaged perennial discharge obtained from the flow duration curve at the planned water intake location, so that being knowledgeable about the turbine design discharge is of great significance.The paper shows the previously mentioned parameters for nineteen planned SHPPs with capacities bellow 1 MW at the territory of Montenegro. For each SHPP, design discharge is determined according to two criteria: the highest electricity production and the highest income.sr
dc.language.isoensr
dc.rightsrestrictedAccesssr
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.source14th International Conference on Accomplishments in Mechanical and Industrial Engineering, DEMI 2019sr
dc.subjectsmall hydro power plantsr
dc.subjectdesign dischargesr
dc.subjectSHPP installed parametersr
dc.subjectinstalled capacitysr
dc.titleDesign discharge determination for SHPPs with below 1 MW capacitysr
dc.typeconferenceObjectsr
dc.rights.licenseBYsr
dc.citation.rankM33
dc.description.otherFull Papers Proceeding of 14th International Conference on Accomplishments in Mechanical and Industrial Engineering, DEMI 2019, 24-25. May 2019, Banja Luka, Bosnia and Herzegovinasr
dc.identifier.rcubhttps://hdl.handle.net/21.15107/rcub_machinery_6410
dc.type.versionpublishedVersionsr


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record