Show simple item record

dc.creatorNolan, E.
dc.creatorAllsopp, J.
dc.creatorGalata, A.
dc.creatorPedone, G.
dc.creatorŽivković, Branislav
dc.creatorSretenović, Aleksandra
dc.date.accessioned2022-09-19T17:42:46Z
dc.date.available2022-09-19T17:42:46Z
dc.date.issued2015
dc.identifier.urihttps://machinery.mas.bg.ac.rs/handle/123456789/2162
dc.description.abstractThis paper describes a Calibration methodology which is specifically configured to best match actual building performance, based on a case study conducted to calibrate whole building energy model using Building Energy Management System (BEMS) measured data. It details the calibration approach which was designed to meet the specific characteristic of the spaces, systems and energy use in the pilot school building. Two calibration methods were developed; one is for electrical and the other is for thermal energy along with calibrated weather file. The result shows excellent correlation with the measured electricity and room air temperature and demonstrates the effectiveness of the methodology. Mean Bias Error (MBE) and Cumulative Variation of Root Mean Squared Error (CVRMSE) for electricity consumption is 6% and 14% respectively and -5 and 7% for air temperature.en
dc.publisherCRC Press/Balkema
dc.rightsrestrictedAccess
dc.sourceeWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the 10th European
dc.titleCalibrating whole building energy model: a case study using BEMS dataen
dc.typeconferenceObject
dc.rights.licenseARR
dc.citation.epage494
dc.citation.other: 487-494
dc.citation.rankM33
dc.citation.spage487
dc.identifier.doi10.1201/b17396-81
dc.identifier.scopus2-s2.0-84907378449
dc.identifier.wos000380490000067
dc.type.versionpublishedVersion


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record